Dewatering

Itasca can estimate the dewatering needs of a construction site or mine to temporarily lower groundwater levels below the natural groundwater level, in all seasons, to provide for safe excavation construction and working environment during operations. Itasca can predict dewatering rates, including numerical modeling to estimate dewatering and design and optimize the dewatering and water-disposal systems, drain holes, and monitoring wells.

Latest News

Upcoming Events
26 Nov
FLAC3D V7.0 Training Course November 2019
FLAC3D TMis a numerical modeling code for advanced geotechnical analysis of soil, rock, and structural support in three dimensions. FLA... Read More
17 Feb
Itasca Symposium 2020
The Fifth International Itasca Symposium will be held at the University of Vienna (Austria). The Symposium will features the applicatio... Read More
9 Mar
FLAC 8.0 Introductory Training Minneapolis 2019
... Read More