Lined Tunnel Construction in Saturated Ground

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....

29 4月
PFC In-Person Introductory Course
Live in-person introductory training course. This four-day course provides guidance in the use of the Itasca codes PFC2D and PFC3D to s...
29 5月
Getting Started with FLAC2D/FLAC3D
Objectives of the training: •Understand the FLAC2D/ FLAC3D numerical approach and the types ofproblems it can solve•Know how to manipul...
5 6月
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p...