Explore IMAT’s latest upgrade, uniting open-pit and underground mining capabilities for faster, smarter, and more efficient modeling.
Version Notes:FLAC 8.0
Level: Intermediate Runs in Demo: Yes
Stress relaxation in rock after excavation of a circular water tunnel and installation of a liner is examined with FLAC. The liner is installed and pressurized instantaneously to permit the stress field to respond to radial strain in the liner.