Lined Tunnel Construction in Saturated Ground

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • Software Benchmark Tests To help with your hardware configuration decisions, Itasca has created an online benchmark speed test...
    Read More
  • Meet Our Summer Interns Itasca is pleased to welcome three graduate student summer interns to Minneapolis. They will be...
    Read More
  • New Itascans Itasca welcomes Amanda Schendel and Luis Wasserman to our team....
    Read More

Upcoming Events
26 Aug
Deep Foundations Institute S3: Slopes, Slides and Stabilization
The conference focuses on effective application of deep foundations, ground improvement, and soil mixing for stabilization of slopes an... Read More
30 Aug
ACG Caving 2022
The Block and Sublevel Caving Conferences provide a platform for mining companies to be kept informed of the latest technological devel... Read More
30 Aug
IACMAG 2022
16th International conference of International Association for Computer Methods and Advances in Geomechanics (IACMAG). ... Read More