A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • 2020 Peter A. Cundall Award ...
    Read More
  • 2020 Peter A. Cundall Award copy ...
    Read More
  • Itasca Symposium 2020 Technical Papers and Statistics ...
    Read More

Upcoming Events
3 Dec
What's New in UDEC 7
Please join us for an overview of the features and capabilities now available in UDEC 7... Read More
17 Feb
Itasca Symposium 2020
The Fifth International Itasca Symposium will be held at the University of Vienna (Austria). The Symposium will features the applicatio... Read More
9 Mar
FLAC Introductory Training - Minneapolis
... Read More