A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • 2019 Sloan Outstanding Paper Award Dr. Mojtaba Bahaaddini (Shahid Bahonar University of Kerman), along with Associate Professor Glenn Sharrock (Itasca/UQ),...
    Read More
  • Itasca Awarded Prestigious Caving 2040 Research Grant Itasca’s research aims to answer the key industry question “how should block caves be designed...
    Read More
  • InSite V3.15 Now Available! Itasca Consulting Ltd (ICL) is pleased to announce the latest release of the InSite family...
    Read More

Upcoming Events
26 Jun
Discrete element modelling of dam foundations
Learn about modeling dam foundations using the discrete element method with UDEC and 3DEC software in the 26th ISRM Online Lecture.... Read More
1 Oct
FLAC3D 7.0 Introductory training course
... Read More
14 Oct
Focused Seismic and Liquefaction Training 2019
Itasca is offering a focused training session with instruction by experienced engineering consultants, hands-on modeling exercises, and... Read More