Analysis of a Concrete Diaphragm Wall

Software

Version Notes:
FLAC 8.0

Level: Intermediate
Runs in Demo: Yes

Write Up
Walk Through
Project Files
Consulting Services

The stages of construction of a concrete diaphragm wall are simulated with FLAC. The analysis begins with the concrete diaphragm wall cast in place. Dewatering, excavation and installation of support struts are simulated in five excavation stages. Distribution of shear forces and bending moments in the wall, axial forces in the struts and displacements of the soil behind the wall are calculated during the five stages.

Keywords:

  • Multistage excavation
  • Dewatering
  • Concrete diaphragm wall
  • Support struts
  • Importing stratigraphy geometry
  • Beam elements
  • Interfaces
  • Large strain
  • Mohr-Coulomb model

Materials:

  • Concrete
  • Soil

Analyses:

  • Fluid Flow
  • Static
Latest News
  • ITASCA Releases MassFlow version 9.0 ...
    Read More
  • Introducing IMAT (ITASCA Mining Analysis Toolbox): Transforming Mining Analysis Solutions ...
    Read More
  • 3DEC 9 Officially Released ...
    Read More

Upcoming Events
22 Apr
FLAC2D In-Person Introductory Course
Live in-person introductory training course. This 3-day course provides a general overview of FLAC2D and covers many basic concepts and... Read More
29 Apr
PFC In-Person Introductory Course
Live in-person introductory training course. This four-day course provides guidance in the use of the Itasca codes PFC2D and PFC3D to s... Read More
29 May
Getting Started with FLAC2D/FLAC3D
Objectives of the training: •Understand the FLAC2D/ FLAC3D numerical approach and the types ofproblems it can solve•Know how to manipul... Read More