Technical Papers

Depressurising an Underground Ore Body at the McArthur River Mine in Northern Saskatchewan, Canada

Abstract:

Pre-mining depressurising of a deep ore body at the McArthur River mine in northern Saskatchewan was considered to decrease the risk associated with mining near 5 MPa water pressure and increasing the amount of ore that can be extracted. Based on a limited amount of field data, a three-dimensional finite element ground-water flow model was developed to predict the amount of water that would have to be pumped from surface wells or extracted with underground drainholes to meet this goal and the associated magnitude and extent of drawdown that would propagate to the surface over the life of the operation and its impact on surface-water resources.

Citation:

Liu, H., J. Hatley, R. Bashir, and L.C. Atkinson. 2008. “Depressurising an Underground Ore Body at the McArthur River Mine in Northern Saskatchewan, Canada.” Proceedings of 10th International Mine Water Association Congress (Karlovy Vary, Czech Republic, June), paper no. 206. Ostrava: VSB – Technical University of Ostrava.

Authors:

Houmao Liu

Link to Full Text:

Depressurizing an Underground Ore Body.pdf

Latest News
  • 2019 Sloan Outstanding Paper Award Dr. Mojtaba Bahaaddini (Shahid Bahonar University of Kerman), along with Associate Professor Glenn Sharrock (Itasca/UQ),...
    Read More
  • Itasca Awarded Prestigious Caving 2040 Research Grant Itasca’s research aims to answer the key industry question “how should block caves be designed...
    Read More
  • InSite V3.15 Now Available! Itasca Consulting Ltd (ICL) is pleased to announce the latest release of the InSite family...
    Read More

Upcoming Events
26 Jun
Discrete element modelling of dam foundations
Learn about modeling dam foundations using the discrete element method with UDEC and 3DEC software in the 26th ISRM Online Lecture.... Read More
1 Oct
FLAC3D 7.0 Introductory training course
... Read More
14 Oct
Focused Seismic and Liquefaction Training 2019
Itasca is offering a focused training session with instruction by experienced engineering consultants, hands-on modeling exercises, and... Read More