Dewatered Construction of a Braced Excavation

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A braced excavation is constructed in saturated ground. The construction stages, dewatering, excavation and braced support construction are simulated with FLAC. The purpose is to evaluate the deformation of the ground adjacent to the excavation and the performance of the wall and strut support. Three different material constitutive models are used to represent the soil behavior: Mohr-Coulomb, Cysoil, and PH models. The deformational response produced by these three models are compared.

Keywords:

  • Braced excavation
  • Saturated soil
  • Horizontal struts
  • Diaphram wall
  • support
  • Dewatering
  • Mohr-Coulomb model
  • Cysoil model
  • PH model
  • Plastic
  • Hardening
  • Construction sequence
  • Excavation
  • Settlement

Materials:

  • Clay
  • Sand
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • 2020 Peter A. Cundall Award ...
    Read More
  • 2020 Peter A. Cundall Award copy ...
    Read More
  • Itasca Symposium 2020 Technical Papers and Statistics ...
    Read More

Upcoming Events
3 Dec
What's New in UDEC 7
Please join us for an overview of the features and capabilities now available in UDEC 7... Read More
17 Feb
Itasca Symposium 2020
The Fifth International Itasca Symposium will be held at the University of Vienna (Austria). The Symposium will features the applicatio... Read More
9 Mar
FLAC Introductory Training - Minneapolis
... Read More