Abstract:

The proliferation of mine pits that intersect the groundwater table has engendered interest in environmental consequences of the lakes that form after cessation of dewatering. The Getchell Main Pit (GMP) in Nevada hosts arsenic sulfide (AsxSy) mineralization (e.g., orpiment and realar) and ambient groundwater As up to 1.8 mg L-1 , making groundwater inflow a potentially significant As source to the future pit lake. Predictive simulations using MODFLOW-SURFACT show that the GMP lake water level will recover to within 99% of the pseudo-equilibrium stage within 100 years after the end of dewatering, resulting in a 75-m deep, terminal pit lake. The juvenile GMP lake (after 5 years) will be calcium sulfate, pH 7.8 water body containing 920 mg L-1 TDS and 0.6 MG L-1 As evolving towards ph 7.9, 1580 mgL-1 TDS and 0.9 mg L-1 As water body after 100 years. The predicted pit lake chemistry is consistent with earlier pit lake water quality after 16 years when the South and Center Pits, precursors to the Main pit, were allowed to fill during a mining hiatus (1968-1984). The GMP mature pit lake chemistry was used to assess ecological risk to potential local receptors, i.e., mallard duck, cliff swallow, golden eagle, little brown bat, spotted sandpiper, deer mouse, mule deer and cattle. Arsenic does not strongly bioaccumulate through the food chain at Getchell; hence, pit lake As will not pose an unacceptable risk.

Citation:

Davis, A., T. Bellehumeur, P. Hunter, B. Hanna, C. G. Fennemore, C. Moomaw and S. Schoen. “The Nexus Between Groundwater Modeling, Pit Lake Chemogenesis and Ecological Risk from Arsenic in the Getchell Main Pit, Nevada, U.S.A.,” Chem. Geol., 228, 175-196 (2006).

Authors:

Braden Hanna

Link to Full Text:

Pit-Lake Chemistry and Ecological Risk.pdf

Latest News
  • Thank You to our Summer Interns ITASCA Minneapolis is lucky to have welcomed nine amazing and dedicated summer interns in our...
    Read More
  • Introducing IMAT: Transforming Mining Analysis Solutions Introducing IMAT: Revolutionizing mining analysis with advanced geotechnical modeling and seismic data integration....
    Read More
  • ITASCA Unveils XSite 4.0: Advancing Hydraulic Fracturing Simulation ITASCA announces the launch of XSite 4.0, a groundbreaking advancement in hydraulic fracturing simulation software....
    Read More

Upcoming Events
26 Aug
FLAC3D V9.1 and Griddle V2.0 2024
... Read More
17 Sep
MassMin
Held once every four years, MassMin unites global experts to tackle the industry's most pressing sustainability challenges. MassMin pro... Read More
22 Sep
SMRI Fall 2024
The Solution Mining Research Institute (SMRI) was established in 1965 as a venue for the solution mining and underground storage indust... Read More